Wokingham Borough Council

WoBC Winter 2026/27 Report

Campaign News

Safer Streets Programme: Expanding 20mph Zones

Six residential roads in the Evendons area of Wokingham — Eastheath Avenue, Reeves Way, Heath Close, Eastheath Gardens, Thorpe Close, and Crail Close — are set to have their speed limits reduced from 30mph to 20mph under Wokingham Borough Council’s Safer Streets programme.

The rollout will begin on Eastheath Avenue, just off Finchampstead Road. Frequently used as a rat-run by drivers avoiding main road congestion, the street is also an important local link for people walking and cycling to nearby schools and amenities.

The proposed reduction here received strong backing, with 71% of respon-dents (25 out of 35) supporting the change in the Council’s consultation. Beyond the initial rollout, public consultations for a further five Safer Streets zones closed on 9 November, drawing responses from 1,911 residents.

This high level of engagement sends a clear message to decision makers about how strongly local communities value quieter, safer streets and effective traffic calming. The next five areas lined up for potential 20mph limits are:

  • Wokingham Town Centre and Norreys Avenue (improving safety around busy shopping streets and key commuter/school routes)
  • Twyford Village centre and surrounding streets (supporting safer active travel to the station and local shops)
  • Finchampstead Village
  • Silverdale Road and adjacent streets in Lower Earley (a key residential corridor heavily used by cyclists and school traffic)
  • Hare Hatch and surrounding roads

Lowering default residential speed limits is one of the fastest and most cost-effective ways to improve active travel conditions and improve the liveability of an area (reducing noise and pollution from vehicles).

Wokingham Borough Council deserves credit for pushing these improvements forward — especially given that Reading Borough Council has yet to adopt a similar borough-wide approach to residential 20mph zones.

Woodley to Reading Cycle Route: A Major Cross-Boundary Link

The first phase of the long-awaited Woodley to Reading cycle route — running from Woodley Precinct along Woodlands Avenue to Culver Lane — officially opened in October. Work on the second phase, extending from Culver Lane along Palmer Park Avenue into Palmer Park, is now underway and scheduled for completion early in the New Year.

Funded through the government’s Active Travel Fund, the scheme will deliver roughly 2.5km of high-quality, LTN 1/20 compliant, cycle infra-structure. This means proper physical separation from motor traffic — such as stepped or kerbed cycle tracks, parallel zebra/cycle crossings at side roads, and safer junction treatments — rather than just painted lines.

Once Phase 2 connects into the existing network through Palmer Park and onto the A4/London Road, it will create a continuous, direct active travel corridor linking Woodley with East Reading. To celebrate and promote the new link once Phase 2 opens, Reading Cycle Campaign (RCC) will be organising a group ride in the New Year.

This will be a great opportunity to try out the new infrastructure in a friendly, supported group — keep an eye on RCC’s social media channels and website for dates and details!

Alex Cran
WoBC Campaigner for RCC

Leave a Reply

Your email address will not be published. Required fields are marked *