
It’s been a relatively quiet couple of months with RBC. The good news is it looks as though the Bath Road and Castle Hill scheme, which we reported on in the last newsletter, will start construction early next year.
We have however heard nothing further about other schemes, such as those funded through Active Travel Fund grants for this and future years, including our suggested list of ‘quick-win’ schemes, cycle hangars, or importantly tackling issues of cycle and pedestrian safety across the town. Hopefully we will hear something soon.
Sidmouth Street
A key issue over the summer has been RBC’s proposal for the partial removal of the Sidmouth Street cycle lane as part of plans to introduce a bus lane on London Road. These changes have been subject to public consultation, and we have formally objected to the proposed scheme.
Although we acknowledge that the existing Sidmouth Street scheme is little used due to lack of connectivity with other cycle facilities, providing additional highway space for general traffic by taking away dedicated space for cyclists would seem to be contrary to RBC policies to limit vehicular traffic growth, reduce air pollution and encourage walking and cycling.
The proposed scheme will also make it much more difficult and less safe for both cyclists and pedestrians crossing Sidmouth Street at South Street. We have suggested the proposed changes to this cycle route would be more acceptable if improvements were included to make alternative local cycle facilities safer, more connected, more convenient and easier to use in order to develop the overall network of routes in this part of the town.
We are now in active discussions with RBC about possible changes to the Sidmouth Street scheme, and we will update RCC members with the results.
Normans Insurance Site Redevelopment
Back in 2024, we were involved in pre-application discussions on proposals to redevelop the Normans Insurance office site (next to Thames Water HQ) into flats.
The proposal has a number of benefits for cyclists, including widening and improving the Thameside path fronting the site, which is a popular walking and cycling route as well as forming part of National Cycle Network Route 5.
Also, the existing path along the western side of the site forms part of the walking and cycling route between central Caversham and Reading station/Reading town centre via Christchurch Bridge.
It is very well used for everyday journeys but presently the route is relatively narrow with poor visibility and tight bends. The proposed development includes widening and straightening the path and will be a major improvement in terms of user amenity and convenience.
A formal planning application has now been approved by RBC although it is likely to be some time before the development is completed.
Kennetside Bridge Repairs

We’ve just heard from RBC that maintenance works are planned on the Kennetside Bridge over Gunters Brook, which is close to Queens Road car park. There are presently large reinforcement plates over the wooden bridge surface, which suggests a problem with the bridge decking.
This is a very well used route for cyclists and those walking into Reading town centre from the east, and closing the bridge to carry out these works would be severely disruptive.
We don’t have full details as yet, but it is likely that the works will be undertaken early next year and would take one to two weeks. We will ask RBC for more details and will update RCC members as soon as we have further details.
Future Meetings
We have regular informal meetings with RBC officers to discuss progress on the various schemes and initiatives that are on-going. If there are any suggestions or issues from members, we would be happy to raise them at the next formal meeting, which is the Cycle Forum on 10 February 2027.
Tony Carr
RBC Campaigner for RCC
