WoBC Spring 2026 Report
Network Rail to Rebuild the Earley Station Footbridge The planning consultation to rebuild the footbridge between the platforms at Earley station closed on 3 March 2026. This bridge will replace […]
Continue ReadingNetwork Rail to Rebuild the Earley Station Footbridge The planning consultation to rebuild the footbridge between the platforms at Earley station closed on 3 March 2026. This bridge will replace […]
Continue ReadingDear RCC members Bike theft is a really big issue which probably stops many people from cycling as much as they would like, or even leads to them giving up […]
Continue ReadingThemed Rides and Traffic Lights The end of last year saw lots of themed rides, with a Hallowe’en and Christmas Kidical Mass ride as well as an evening Glow Ride […]
Continue ReadingRecent News ReadingToday: Reading tops bike theft rate per cyclist as campaign urges secure storage: https://tinyurl.com/mryuxjvj London Cycle Campaign are calling for action to be taken on cycle theft, and […]
Continue ReadingReading Cycle Campaign (RCC) has just run a survey to understand the real impact of bike theft in Reading. Twenty‑five residents shared their experiences, with several reporting multiple thefts. Their […]
Continue ReadingBike theft is a growing problem in Reading, and its impact goes far beyond the financial loss. A bike can be the main way to get to work, to take […]
Continue ReadingThe Department for Transport is consulting on proposals that would allow powered wheelchairs and mobility scooters to use cycle lanes. This would be a big step for inclusive mobility, but […]
Continue ReadingReading Borough Council (RBC) is currently consulting on priorities for spending the 15% neighbourhood portion of the Community Infrastructure Levy (CIL). CIL is a charge on new developments that helps […]
Continue ReadingThe Winter 2025/26 RCC newsletter pdf is now downloadable from the Newsletters page, or you can also click on each article to read them separately. In this issue we talk about: RBC […]
Continue ReadingA33 Kennet Bridge As part of Reading Borough Council’s A33 Bus Rapid Transit (BRT) scheme a new pedestrian and cycle bridge has been constructed over the River Kennet. This doesn’t […]
Continue Reading